Power Grid
Notes
We
are playing on the Spain and Portugal map and a designer deck. Energy
Crisis expansion is not in play (1 in favor, 1 opposed, 3 abstain).
Power plants will be
noted in the following format: XX Fuel I→O
(FF), where XX is the power plant number, “Fuel” is the type of
fuel it takes, I is the number of inputs, O is the number of cities
it powers, and (FF) is the amount of fuel stored on it, if any.
Power plants 13, 15, and 16 will be placed on top of the deck at the
start of Step 2.
Turn 1
Bidding
TRC opens the bidding on power plant 04 at 4 Elektros. Industria Optimum bids 5. Power Hungary passes. GEGS passes. NTO passes. TRC bids 6. Industria Optimum passes. Power plant 11 is added to the future market, pushing power plant 05 to the current market.
Industria Optimum opens the bidding on power plant 03 at 3 Elektros. Power Hungary passes. GEGS passes. NTO passes. Power plant 42 is added to the future market, pushing power plant 06 to the current market.
Power Hungary opens the bidding on power plant 06 at 6 Elektros. GEGS passes. NTO passes. Power plant 26 is added to the future market, pushing power plant 07 to the current market.
GEGS opens the bidding on power plant 05 at 5 Elektros. NTO bids 6. GEGS bids 7. NTO bids 8. GEGS bids 9. NTO bids 10. GEGS bids 11. NTO passes. Power plant 57+ is added to the future market, pushing power plant 08 to the current market.
NTO spends 7 Elektros for power plant 07. Power
plant 29 is added to the future market, pushing power plant 11 to the
current market.
Fuel Purchases
Industria Optimum buys 2 coal for 2 Elektros.
TRC buys 2 coal for 3 Elektros.
GEGS buys 5 coal for 14 Elektros.
Power Hungary buys 1 trash for 7 Elektros.
NTO buys 2 oil for 4 Elektros.
Grid Connections
Industria Optimum connects to Sosnoweic for 10 Elektros (power plant 01 is discarded, power plant 28 is added to the future market, pushing power plant 26 to the current market) and Czȩstochowa for 15 Elektros (power plant 02 is discarded, power plant 09 is added to the current market).
TRC connects to Česke Budĕjovice for 10 Elektros and Wein for 24 Elektros.
GEGS connects to Katowice for 10 Elektros and Ostrava for 14 Elektros.
Power Hungary connects to Bratislava for 10 Elektros and Trmava for 12 Elektros.
NTO connects to Banska Bystrica for 10 Elektros and
Budapest for 22 Elektros.
Bureaucracy
Power Cities
NTO powers 2 cities, spending 2 oil and gaining 33 Elektros.
Power Hungary powers 2 cities, spending 1 trash and gaining 33 Elektros.
GEGS powers 2 cities, spending 3 coal and gaining 33 Elektros.
TRC powers 1 city, spending 1 coal and gaining 22 Elektros.
Industria Optimum powers 1 city, spending 1 coal and gaining 22 Elektros.
Adjust Power Plant Market
Power plant 57+ is moved to the bottom of the deck and power plant 20 is added to the current market, pushing power plant 26 to the future market.Turn 2
Bidding
NTO opens the bidding on power plant 20 for 20 Elektros. Power Hungary bids 21. GEGS passes. TRC passes. Industria Optimum passes. NTO passes. Power plant 19 is added to the current market. NTO opens the bidding on power plant 08 at 8 Elektros. GEGS bids 9. TRC passes. Industria Optimum passes. NTO passes. Power plant 23 is added to the current market. NTO opens the bidding on power plant 11 at 11 Elektros. TRC bids 12. Industria Optimum passes. NTO bids 13. TRC bids 14. NTO passes. Power plant 46+ is added to the future market, pushing power plant 26 down to the current market. NTO opens the bidding on power plant 09 at 9 Elektros. Industria Optimum passes. Power plant 36 is added to the future market, pushing power plant 28 to the current market.
Industria Optimum buys power plant 26 for 26
Elektros. Power plant 33 is added to the future market, pushing
power plant 29 to the current market.
Fuel Purchases
Industria Optimum passes.
TRC passes.
GEGS buys 1 oil for 2 Elektros and 3 coal for 7 Elektros.
Power Hungary buys 1 trash for 6 Elektros.
NTO buys 3 oil for 9 Elektros.
Grid Connections
Industria Optimum connects to Kraków for 14 Elektros.
TRC passes.
GEGS passes.
Power Hungary passes.
NTO connect to Poprad for 21 Elektros.
Bureaucracy
Power Cities
NTO powers 3 cities, spending 3 oil and gaining 44 Elektros.
Power Hungary powers 2 cities, spending 1 trash and gaining 33 Elektros.
GEGS powers 2 cities, spending 2 coal and 1 oil and gaining 33 Elektros.
TRC powers 2 cities, spending 1 coal and gaining 33 Elektros.
Industria Optimum powers 3 cities, gaining 44 Elektros.
Adjust Power Plant Market
Power plant 46+ is moved to the bottom of the deck and power plant 50+ is added to the future market.Turn 3
Bidding
Industria Optimum passes.
NTO passes.
Power Hungary passes.
TRC opens the bidding on power plant 23 at 23 Elektros. GEGS passes. Power plant 17 is added to the current market.
GEGS passes.
Fuel Purchases
GEGS buys 3 coal for 8 Elektros.
TRC buys 2 coal for 6 Elektros.
Power Hungary buys 3 coal for 12 Elektros.
NTO buys 3 oil for 9 Elektros.
Industria Optimum buys 1 coal for 4 Elektros.
Grid Connections
GEGS connects to Žilina for 17 Elektros and Brno for 22 Elektros.
TRC connects to Gyor for 18 Elektros.
Power Hungary connects to Kecakwmé for 25 Elektros and Szeged for 15 Elektros.
NTO connect to Košice for 16 Elektros and Prešov for 12 Elektros.
Industria Optimum connects to Łódź for 17 Elektros.
Bureaucracy
Power Cities
Industria Optimum powers 4 cities, spending 1 coal and gaining 54 Elektros.
NTO powers 3 cities, spending 3 oil and gaining 44 Elektros.
Power Hungary powers 4 cities, spending 3 coal and gaining 54 Elektros.
TRC powers 3 cities, spending 2 coal and gaining 44 Elektros.
GEGS powers 4 cities, spending 6 coal, gaining 54 Elektros.
Adjust Power Plant Market
Power plant 50+ is moved to the bottom of the deck and power plant 35 is added to the future market.Turn 4
Bidding
NTO opens the bidding on power plant 28 at 28 Elektros. Industria Optimum must pass. Power Hungary passes. GEGS passes. TRC passes. Power plant 22 is added to the current market.
Industria Optimum opens the bidding on power plant 29 at 29 Elektros. Power Hungary passes. GEGS passes. TRC passes. Power plant 16 is added to the current market.
Power Hungary passes.
GEGS opens the bidding on power plant 17 at 17 Elektros. TRC passes. Power plant 34 is added to the future market, pushing power plant 33 to the current market.
TRC passes.
Fuel Purchases
TRC buys 2 coal for 5 Elektros.
GEGS buys 1 uranium for 2 Elektros, 4 coal for 14 Elektros, and 2 oil for 6 Elektros.
Power Hungary buys 3 coal for 14 Elektros and 1 trash for 4 Elektros.
Industria Optimum buys 1 oil for 4 Elektros.
NTO buys 1 oil for 4 Elektros and 1 uranium for 3
Elektros.
Grid Connections
TRC connects to Graz for 22 Elektros and Linz for 18 Elektros.
GEGS passes.
Power Hungary connects to Miskolc for 20 Elekrtros and Nyíregyháza for 17 Elektros.
Industria Optimum connects to Wroclaw for 19 Elektros and Hradec Králóve for 20 Elektros.
NTO passes.
Bureaucracy
Power Cities
NTO powers 5 cities, spending 1 oil and 1 uranium, gaining 64 Elektros.
Industria Optimum powers 6 cities, spending 1 oil, gaining 73 Elektros.
Power Hungary powers 6 cities, spending 3 coal and 1 trash, gaining 73 Elektros.
GEGS powers 4 cities, spending 3 coal and 1 urainium, gaining 54 Elektros.
TRC powers 5 cities, spending 2 coal, gaining 64 Elektros.
Adjust Power Plant Market
Power plant 42 is moved to the bottom of the deck and power plant 54+ is added to the future market.Turn 5
Bidding
Industria Optimum passes.
Power Hungary passes.
NTO passes.
TRC passes.
GEGS passes. Power plant 16 is discarded and
power plant 12 is added to the current market.
Fuel Purchases
GEGS buys 1 uranium for 2 Elektros and 2 coal for 6 Elektros.
TRC buys 4 coal for 17 Elektros and 1 oil for 3 Elektros.
NTO buys 3 oil for 12 Elektros and 1 urainium for 3 Elektros.
Power Hungary buys 3 coal for 16 Elektros and 1 trash for 4 Elektros.
Industria Optimum buys 2 oil for 8 Elektros.
Grid Connections
GEGS connects to Praha for 23 Elektros and Ústínad Labem for 16 Elektros.
TRC connects to Pécs for 25 Elektros.
NTO connects to Klagenfurt for 39 Elektros and Villach for 14 Elektros.
Power Hungary passes.
Industria Optimum connects to Warszawa for 17 Elektros and Poznan for 19 Elektros.
Step 2 begins. Power plant 12 is discarded and
power plant 14 is added to the current market.
Bureaucracy
Power Cities
Industria Optimum powers 8 cities, spending 1 oil and 1 coal, gaining 90 Elektros.
Power Hungary powers 6 cities, spending 3 coal and 1 trash, gaining 73 Elektros.
NTO powers 7 cities, spending 3 oil and 1 uranium, gaining 82 Elektros.
TRC powers 6 cities, spending 2 coal and 1 oil, gaining 73 Elektros.
GEGS powers 6 cities, spending 3 coal, 2 oil, and 1 urainium, gaining 73 Elektros.
Adjust Power Plant Market
Power plant 54+ is moved to the bottom of the deck and power plant 13 is added to the current market, pushing power plant 33 to the future market.Turn 6
Bidding
Industria Optimum opens the bidding on power plant 22 at 22 Elektros. NTO passes. TRC passes. Power Hungary passes. GEGS passes. Industria Optimum discards power plant 03. Power plant 44 added to the future market, pushing power plant 33 to the current market.
NTO opens the bidding on power plant 33 at 33
Elektros. TRC bids 34. Power Hungary bids 35. GEGS
passes. NTO passes. TRC bids 36. Power Hungary
passes. TRC discards power plant 04. Power plant 37 is
added to the future market, pushing power plant 34 to the current
market. NTO opens the bidding on power plant 34 at 34
Elektros. Power Hungary bids 35. GEGS bids 36. NTO
bids 37. Power Hungary bids 38. GEGS bids 39. NTO
passes. Power Hungary bids 40. GEGS bids 41. Power
Hungary bids 42. GEGS passes. Power plant 40 is added to
the future market, pushing power plant 35 to the current market.
NTO bids 35. GEGS bids 36. NTO bids 37. GEGS bids
38. NTO bids 39. GEGS bids 40. NTO passes. GEGS
discards power plant 08. Power plant 60+ is added to the future
market, pushing power plant 36 to the current market. NTO buys
power plant 36 for 36 Elektros, discarding power plant 09. Power
plant 38 is added to the future market, pushing power plant 37 to the
current market.
Fuel Purchases
GEGS buys 1 uranium for 2 Elektros, 2 oil for 6 Elektros, and 2 coal for 7 Elektros.
Power Hungary buys 3 coal for 13 Elektros and 1 uranium for 3 Elektros.
TRC passes.
NTO buys 2 oil for 8 Elektros and 1 uranium for 4 Elektros.
Industria Optimum buys 2 oil for 9 Elektros.
Grid Connections
GEGS connects to Pilsen for 17 Elektros and Sosnweic for 15 Elektros.
Power Hungary connects to Wein for 18 Elektros, Košice for 19 Elektros, and Prešov for 17 Elektros.
TRC connects to Bratislava for 18 Elektros, Trnava for 17 Elektros, and Salzburg for 19 Elektros.
NTO connects to Žilina for 21 Elektros and Ostrava for 22 Elektros.
Industria Optimum connects to Katowice for 15
Elektros, Bydgoszcz for 17 Elektros, and Praha for 23 Elektros.
Bureaucracy
Power Cities
Industria Optimum powers 11 cities, spending 3 oil, gaining 112 Elektros.
NTO powers 9 cities, spending 2 oil and 1 uranium, gaining 98 Elektros.
TRC powers 9 cities, spending 2 coal, gaining 98 Elektros.
Power Hungary powers 9 cities, spending 3 coal and 1 uranium, gaining 98 Elektros.
GEGS powers 8 cities, spending 2 coal, 2 oil, and 1 urainium, gaining 90 Elektros.
Adjust Power Plant Market
Power plant 60+ is moved to the bottom of the deck and power plant 39 is added to the future market.Turn 7
Bidding
Industria Optimum opens the bidding on power plant 37 at 37 Elektros. NTO bids 38. Power Hungary bids 50. TRC bids 51. GEGS passes. Industria Optimum bids 52. NTO passes. Power Hungary bids 55. TRC passes. Industria Optimum bids 56. Power Hungary passes. Industria Optimum discards power plant 22. Power plant 30 is added to the current market.Fuel Purchase
GEGS buys 3 trash for 5 Elektros and 1 uranium for 3 Elektros.
TRC buys 2 uranium for 9 Elektros and 2 coal for 5 Elektros.
Power Hungary buys 3 trash for 8 Elektros, 3 coal for 10 Elektros, and 1 uranium for 6 Elektros.
NTO buys 2 oil for 8 Elektros and 1 uranium for 7 Elektros.
Industria Optimum buys 1 coal for 4 Elektros and 6
oil for 31 Elektros.
Grid Connections
GEGS connects to Częstochowa for 19 Elektros.
TRC connects to Brno for 23 Elektros and Hradec Králóve for 24 Elektros.
Power Hungary connects to Gyor for 20 Elektros, Budapest for 20 Elektros, and Poprad for 21 Elektros.
NTO connects to Miskolc for 19 Elektros.
Industria Optimum connects to Ústínad Labem for 21
Elektros, Pilzeň for 22 Elektros (power plant 13 is discarded, power
plant 18 is added to the current market), and Gdansk for 18 Elektros
(power plant 14 is discarded, power plant 46 is added to the future
market, moving power plant 39 to the current market).
Bureaucracy
Power Cities
Industria Optimum powers 14 cities, spending 3 oil and 1 coal, gaining 129 Elektros.
NTO powers 10 cities, spending 2 oil and 1 uranium, gaining 105 Elektros.
Power Hungary powers 12 cities, spending 3 coal, 3 trash, and 1 uranium, gaining 118 Elektros.
TRC powers 11 cities, spending 2 coal and 1 uranium, gaining 112 Elektros.
GEGS powers 9 cities, spending 3 trash, and 1 urainium, gaining 98 Elektros.
Adjust Power Plant Market
Power plant 52+ is moved to the bottom of the deck and power plant 27 is added to the current market, pushing power plant 39 to the future market.
Turn 8
Bidding
Industria Optimum opens the bidding on power plant 32 at 32 Elektros. Power Hungary passes. TRC passes. NTO passes. GEGS passes. Industria Optimum discards power plant 26. Power plant 50 is added to the future market, pushing power plant 39 to the current market.
Power Hungary passes.
TRC passes.
NTO passes.
GEGS passes.
Fuel Purchases
GEGS buys 1 oil for 5 Elektros and 3 trash for 7 Elektros.
NTO buys 3 trash for 10 Elektros, 2 coal for 4 Elektros, and 1 uranium for 6 Elektros.
TRC buys 2 coal for 5 Elektros.
Power Hungary buys 3 trash for 10 Elektros, 3 coal for 10 Elektros, and 1 uranium for 7 Elektros.
Industria Optimum buys 3 oil for 17 Elektros and 1
coal for 4 Elektros.
Grid Connections
GEGS connects to Krakow for 19 Elektros, Łódź for 22 Elektros, Banská Bystrica for 21 Elektros, and Warszawa for 22 Elektros.
NTO connects to Nyíregyháza for 22 Elektros, Kecakwmé for 21 Elektros, Szeged for 20 Elektros, and Graz for 25 Elektros.
TRC connects to Wroclaw for 25 Elektros, Poznan for 24 Elektros, and Byogoszcz for 22 Elektros.
Power Hungary connects to Linz for 26 Elektros, Česke Budějovice for 23 Elektros, Salzburg for 24 Elektros, and Innsbruck for 25 Elektros.
Industria Optimum connects to Gdnya for 10 Elektros
and Szczecin for 24 Elektros.
Bureaucracy
Power Cities
Industria Optimum powers 16 cities, spending 6 oil and 1 coal, gaining 138 Elektros.
Power Hungary powers 15 cities, spending 3 coal, 3 trash, and 1 uranium, gaining 134 Elektros.
TRC powers 13 cities, spending 2 coal and 1 uranium, gaining 124 Elektros.
NTO powers 14 cities, spending 2 coal, 3 trash, and 1 uranium, gaining 129 Elektros.
GEGS powers 12 cities, spending 3 trash, and 1 oil, gaining 118 Elektros.
Adjust Power Plant Market
Power plant 50 is moved to the bottom of the deck and power plant 15 is drawn, then discarded, then Step 3 is drawn. Power plant 18 and Step 3 are discarded and Step 3 begins.Turn 9
Bidding
Industria Optimum opens the bidding on power plant 39 at 39 Elektros. Power Hungary passes. NTO passes. TRC passes. GEGS passes. Industria Optimum discards power plant 29. Power plant 46+ is added to the market.
Power Hungary opens the bidding on power plant 46 at 46 Elektros. NTO passes. TRC bids 47. GEGS bids 48. Power Hungary bids 49. TRC passes. GEGS passes. Power Hungary discards power plant 34. Power plant 60+ is added to the market.
NTO opens the bidding on power plant 44 at 44 Elektros. TRC passes. GEGS bids 45. NTO bids 46. GEGS bids 47. NTO bids 48. GEGS bids 49. NTO bids 50. GEGS bids 51. NTO bids 52. GEGS passes. NTO discards power plant 28. Power plant 57+ is added to the market.
TRC opens the bidding on power plant 57+ at 57 Elektros. GEGS bids 58. TRC bids 59. GEGS passes. TRC discards power plant 23. Power plant 50+ is added to the market.
GEGS buys power plant 40 for 40 Elektros, discarding
power plant 17. Power plant 42 is added to the market.
Fuel Purchases
GEGS buys 2 oil for 10 Elektros and 3 trash for 11
Elektros.
TRC buys 1 uranium for 6 Elektros and 3 oil for 17 Elektros.
NTO buys 3 trash for 14 Elektros and 2 coal for 6 Elektros.
Power Hungary buys 2 oil for 13 Elektros, 3 trash for 14 Elektros, and 4 coal for 15 Elektros.
Industria Optimum buys 5 oil for 38 Elektros.
Grid Connections
GEGS connects to Byogoszcz for 32 Elektros, Gdansk for 23 Elektros, and Gdnya for 15 Elektros.
TRC connects to Klagenfurt for 25 Elektros, Villach for 19 Elektros, and Częstochowa for 29 Elektros.
NTO connects to Katowice for 24 Elektros, Sosnoweic for 20 Elektros, and Kraków for 24 Elektros.
Power Hungary connects to Pécs for 26 Elektros.
Industria Optimum connects to Budapest for 48
Elektros.
Bureaucracy
Power Cities
Industria Optimum powers 12 cities, spending 3 oil and 1 coal, gaining 118 Elektros.
Power Hungary powers 17 cities, spending 4 coal, 3 trash, and 2 oil, gaining 142 Elektros.
NTO powers 17 cities, spending 2 coal and 3 trash, gaining 142 Elektros.
TRC powers 17 cities, spending 3 oil and 1 uranium, gaining 142 Elektros.
GEGS powers 16 cities, spending 3 trash and 2 oil, gaining 138 Elektros.
Adjust Power Plant Market
Power plant 19 is discarded and power plant 50 is added to the market.Turn 10
Bidding
TRC opens the bidding on power plant 60+ at 60 Elektros. Power Hungary bids 61. NTO bids 62. Industria Optimum bids 63. GEGS passes. TRC bids 64. Power Hungary bids 65. NTO bids 66. Industria Optimum bids 67. TRC bids 68. Power Hungary bids 69. NTO bids 70. Industria Optimum bids 71. TRC bids 72. Power Hungary bids 73. NTO bids 74. Industria Optumum bids 75. TRC bids 76. Power Hungary bids 77. NTO bids 78. Industria Optimum bids 79. TRC bids 80. Power Hungary bids 81. NTO bids 82. Industria Optimum bids 83. TRC passes. Power Hungary bids 84. NTO passes. Industria Optimum bids 85. Power Hungary passes. Industria Optimum moves 2 oil from power plant 32 to power plant 37 and discards power plant 32. Power plant 52+ is added to the market. TRC bids 50 on power plant 50+. Power Hungary bids 51. NTO bids 52. GEGS bids 53. TRC bids 54. Power Hungary bids 55. NTO bids 56. GEGS bids 57. TRC bids 58. Power Hungary passes. NTO bids 59. GEGS passes. TRC bids 60. NTO bids 61. TRC bids 62. NTO bids 63. TRC bids 65. NTO bids 66. TRC bids 67. NTO bids 68. TRC bids 70. NTO bids 71. TRC bids 73. NTO bids 74. TRC bids 75. NTO bids 76. TRC passes. NTO discards power plant 30. Power plant 54+ is added to the market. The power plant draw deck is exhausted. TRC opens the bidding on power plant 52+ at 52 Elektros. Power Hungary passes. GEGS bids 53. TRC bids 54. GEGS bids 55. TRC bids 57. GEGS bids 58. TRC bids 59. GEGS passes. TRC discards power plant 57+.
Power Hungary opens the bidding on power plant 46+ at 46 Elektros. GEGS passes. Power Hungary discards power plant 21.
GEGS buys power plant 50 for 50 Elektros, discarding
power plant 35.
Fuel Purchases
GEGS buys 3 trash for 14
Elektros and 1 oil for 7 Elektros.
Industria Optimum buys 1 oil for 7 Elektros.
NTO buys 2 coal for 6 Elektros and 2 uranium for 11 Elektros.
Power Hungary buys 8 coal for 39 Elektros.
TRC buys 1 uranium for 7
Elektros and 3 trash for 14 Elektros.
Grid Connections
GEGS connects to Wein for 28 Elektros and Bratislava for 23 Elektros.
Industria Optimum connects to Ostrava for 24 Elektros, Žilina for 27 Elektros, and Banska Bystrica for 26 Elektros.
NTO connects to Gyor for 25 Elektros and Trnava for 25 Elektros.
Power Hungary connects to Praha for 30 Elektros and
Ústí nad Labem for 26 Elektros.
TRC connects to Gdansk for 28 Elektros and Gdyna for
20 Elektros.
Bureaucracy
Power Cities
TRC powers 17 cities, spending trash and 1 uranium, gaining 142 Elektros.
Power Hungary powers 19 cities, spending 8 coal, gaining 148 Elektros.
NTO powers 19 cities, spending 2 coal and 2 uranium, gaining 148 Elektros.
Industria Optimum powers 20 cities, spending 3 oil, gaining 150 Elektros.
GEGS powers 18 cities, spending 3 trash and 1 oil, gaining 145 Elektros.
End of Game
End of Game Statements
Chris Geggus (GEGS): Maybe one day. The rest of you do seem to have a more intuitive feel for the game, whereas I seem to just struggle from turn to turn. Even on the last turn I thought I was heading for 19 cities, but my calculations were obviously off again. Congrats to Kevin and thanks to Chris.
Kevin Wilson
(Industria Optimum): I learned a lesson with Power Grid in
this game, watch the coming resources. I could have ended it last turn
but got shut out of oil to fuel the plants. I wasn’t watching
that closely enough and didn’t see the limits coming into play.
By then I was committed and was going to remain exposed to oil but got
a little bit lucky in that first, I finally got off the lead with
others buying bigger plants and second, was able to diversify away from
oil just a bit with only one oil plant to come. That left me with
access to the cities that Gegs couldn’t block going before me and the
cash to make the connections. Early on (turn 4?) I didn’t want to
pass but the plant I wanted was in the future market so I picked a
plant I thought others would want and no one bid. I got stuck
with it and ended up in the #1 spot the rest of the game and, as a
result, got shut out on resources in the penultimate turn. But,
no one else could trip 18 and win so another round we had and that let
me use the cash I had accumulated. Once it was clear I wasn’t
going to get off the #1 spot it was just a plan to generate as much
cash as possible and hope for a break, which did finally come.
I wondered if Gegs might just play spoiler the last turn. I
didn’t think he could win. If he let me get oil then I get to 20
cities and he couldn’t. If he shut me out of oil again by buying
54+ and all the oil he still couldn’t win cause it would use up his
cash but could have kept me from winning too. So, I wasn’t sure
if he’d want to just mess with me or not. Turns out he
didn’t. Thank you! ;-)
Thanks to Chris for running the game as usual and to the rest for
playing. At least no stupid math errors like 2 or 3 games ago
when I missed a whole plant opportunity for poor arithmetic.
Dave Hooton (Power
Hungary): Kevin had a big financial advantage in this
game. After the fourth player shoehorned himself into the center/south,
Kevin had the entire north to himself. Note that he was able get to 20
cities by a margin of only 4 Elektros. On the other hand, I missed
ending the game on the previous turn by less than 15 Elektros.
I did make one mistake during the final turn. I thought Chris G. could
improve his position from fourth to third by buying Plant 54+ instead
of Plant 50 along with the remainder of the oil, sending Kevin to the
rear. What I didn't realize was that the extra cost would have put him
behind Andy. so there was no real gain for him.
It was a fun game, with everything up in the air until the final turn.
Thanks, Chris, for running it.
Bill Scharf (NTO):
Congrats to Kevin on his win, and thanks Chris for running it. Always
fun.
Players
Order |
Player Name |
Company Name |
Color |
Power Plants |
Cities |
Money |
1 |
Andy York | TRC |
Blue | 31 Nuclear 1→5, 33 Eco X→4, 52+ Trash 3→8 | 19 |
165 |
4 |
Kevin Wilson |
Industria
Optimum |
Green |
37 Oil 3→7, 39 Eco X→5, 60+ Fusion X→8 | 20 |
154 |
2 |
Dave Hooton |
Power Hungary |
Orange | 20
Coal
3→5, 46 Hybrid 3→7, 46+ Coal 2→7 |
19 |
166 |
5 |
Chris Geggus |
GEGS |
Yellow |
38 Trash 3→7, 40 Oil 1→6, 50 Fusion X→6 | 18 |
163 |
3 |
Bill Scharf |
NTO |
Pink | 36 Hybrid 2→6, 44 Fusion X→6, 50+ Nuclear 2→8 | 19 |
155 |
GEGS is Gamer Excessively Grabbing at Straws. TRC is Texas Railroad Commission. NTO is Number Ten Ox.
Power Plant Market
27 Trash 1→4
42 Coal 2→6
54+ Oil 2→8
Fuel
Price |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
10 |
12 |
14 |
16 |
Uranium | 1 |
1 |
1 |
1 |
1 |
1 |
||||||
Trash | 1 |
3 |
3 |
3 |
||||||||
Oil | 3 |
|||||||||||
Coal | |
1 |
3 |
3 |