Schnauzer

Turn 7

Turn Order Determination

Turn orders is:  RMHL, GERR, NTSB, Platinum Queen.

Prospector and Surveyor Placement

RMHL surveys Glenwood Springs to Rifle (+2) and Rifle to Grand Junction (dr = 7, success), and prospects #38 (+1) and passenger line 10.

GERR surveys Lamy to Santa Fe and Albuquerque to San Ysidro, and prospects #66 and #64.

NTSB surveys Glenwood Springs to Aspen and Colorado Springs to Pueblo, and prospects #38 (+2), #127, and #32.

Platinum Queen surveys Grand Junction to Delta and Delta to Montrose (dr = 5, success), and prospects passenger lines 11 and 16 and #64 (+1).

Dispute Resolution

#64.  GERR dr = 9.  Platinum Queen dr = 7 +1 = 8.  GERR wins, prospector becomes +1.

#38.  RMHL dr = 10 +1 +3 = 14.  NTSB dr = 11 + 2 = 13.  RMHL wins, prospector becomes +2.

Construction and Operations

RMHL builds Glenwood Springs to Rifle for $60 and Rifle to Grand Juncion for $140, and buys claim #38 for $100 and passenger line 10 for $250.  Operates #38 ($40, 1 silver), #88 ($50, 3 coal), and #131 ($30, 3 coal).  Delivers 1 silver from Aspen to Denver for $200 and 2 coal from Wallsenburg to Denver for $160.  Gains $590 in passenger revenues.
GERR builds Lamy to Santa Fe for $60 and Albuquerque to San Ysidro for $100, and buys #64 for $60 and #66 for $60.  Operates #98 ($60, 4 gold), #125 ($20, 3 coal), #100 ($40, 1 gold), #99 ($50, depletes), #122 ($20, 4 coal), #64 ($40, 3 lumber), #66 ($30, 2 lumber).  Gains $280 in passenger revenues.
NTSB builds Colorado Springs to Pueblo for $100 and Glenwood Springs to Aspen for $160, and buys #127 for $60 and #32 for $100.  Operates #132 ($50, 2 coal), #42 ($40, depletes), #55 ($50, 2 lumber), #44 ($40, 3 silver), and #80 ($30, 3 coal).  Delivers 3 coal from Aspen to Denver for $240, 2 coal from Steamboat Springs to Denver for $160, and 2 lumber from Walden to Denver for $200.  Collects $70 in passenger revenues.
Platinum Queen builds Grand Junction to Delta for $100 and Delta to Montrose for $40, and buys passenger line 16 for $465 and passenger line 11 for $310.  Operates #63 ($50, 1 lumber), #73 ($20, 3 coal), #47 ($40, depletes), #52 ($40, 1 silver).  Delivers 3 silver from Eureka to Salt Lake City for $600.  Gain s $410 in passenger revenues.

Deliveries

Gold: None

Copper: None

Silver: 4


Denver
Salt Lake City
Pueblo
Santa Fe
El Paso
Lumber
2
None
None
None
None
Coal
7
None
None
None
None

Price Changes

Gold: +1 to $325

Copper: +1 to $400

Silver: -1 to $200


Denver
Salt Lake City
Pueblo
Santa Fe
El Paso
Lumber
-1 to $80
Remains at $300
+3 to $100
-1 to $30
-1 to $80
Coal
Remains at $80
+1 to $60
Remains at $80
+3 to $120
Remains at $140

Trains and Snowplows

RMHL spends $80 for a +3 snowplow.  GERR passes.  NTSB spends $80 for a +3 snowplow.  Platinum Queen passes.

The Players

Player

Company Name

Color

Turn Order

Starting Location

Money

Trains

Snowplows

Personnel

Dave Hooton Rocky Mountain High Line (RMHL) Orange
1

Denver

$955

9, 15

+3, +3

S, S+2, P, P+2

Andy York

North Texas Survey Board (NTSB)
Blue
3

Denver

$780

15, 15, 24, 24

+2, +3

S, S, P, P, P+2

Bill Scharf

Great Expectations RR (GERR)
Pink
2

El Paso

$3,600

9, 15, 24, 24


S, S, P, P+1

Brendan Whyte

Platinum Queen
Red
4

Salt Lake City

$1,010

9, 15, 24


S, S, P, P, P+1

Personnel in italics are in jail.

Purchased Claims

#

City

Type

Available

Operation

Owner
121
York Canyon
Coal
11

$30; 2: D; 3-6: 2; 7-8: 3; 9-10: 4; 11-12: 5

RMHL
88
Walsenburg
Coal
1

$50; 2-3: D; 4: 1; 5-8: 3; 9-10: 4; 11-12: 5

RMHL
38
Aspen
Silver
0

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3

RMHL
132
Steamboat Springs
Coal
0

$50; 2-3: D; 4: 1; 5: 2; 6-7: 3; 8-12: 4

NTSB
42
Leadville
Silver
2
Depleted
NTSB
55
Walden
Lumber
0
$50; 2-3: D; 4-5: 1; 6-9: 2; 10-12: 3
NTSB
44
Leadville
Silver
3

$40; 2-8: D; 9-10: 2; 11: 3; 12: 4

NTSB
80
Aspen
Coal
0

$30; 2-5: D; 6: 1; 7-9: 3; 10-11: 4; 12: 5

NTSB
127
Westcliffe
Silver
N

$20; 2-8: D; 9: 1; 10: 2; 11-12: 3

NTSB
32
Fairplay
Gold
N

$50; 2-7: D; 8-9: 1; 10: 2; 11-12: 4

NTSB
117
Cloudcroft
Lumber
7
Depleted
GERR
98
Piņos Altos
Gold
4

$60; 2-6: D; 7: 1; 8-10: 2; 11-12: 4

GERR
125
Capitan
Coal
13

$20; 2-3: D; 4: 1; 5-9: 3; 10: 4; 11-12: 5

GERR
104
Mogollon
Silver
5

Depleted

GERR
100
White Oaks
Gold
3

$40; 2-6: D; 7-10: 1; 11: 2; 12: 4

GERR
114
McGaffey
Lumber
2

Depleted

GERR
99
White Oaks
Gold
4

Depleted

GERR
122
Lee Ranch West
Coal
8

$20; 2-3: D; 4-5: 1; 6-7: 2; 8-9: 3; 10-12: 4

GERR
64
Lumberton
Lumber
3

$40; 2-6: D; 7: 1; 8-11: 3; 12: 4

GERR
66
Vallecitos
Lumber
2

$30; 2-5: D; 6: 1; 7-10: 2; 11-12: 4

GERR
130
Bingham
Copper
0

$80; 2: D; 3-9: 1; 10-11: 2; 12: 3

Platinum Queen
119
Farmington
Coal
4
Depleted
Platinum Queen
63
Lumberton
Lumber
9

$50; 2-3: D; 4-5: 1; 6-8: 2; 9-12: 3

Platinum Queen
84
Durango
Coal
10
$20; 2-4: D; 5: 1; 6-8: 3; 9-10: 4; 11-12: 5
Platinum Queen
73
Hiawatha
Coal
13

$20; 2-5: D; 6: 1; 7: 2; 8-9: 3; 10-12: 4

Platinum Queen
69
Schofield
Coal
3

Depleted

Platinum Queen
82
Crested Butte
Coal
5

$20; 2-4: D; 5-6: 2; 7-9: 3; 10-11: 4; 12: 5

Platinum Queen
74
Elk Springs
Coal
3

$20; 2-4: D; 5-6: 2; 7-9: 3; 10: 4; 11-12: 5

Platinum Queen
47
Ouray
Silver
2

Depleted

Platinum Queen
52
Lake City
Silver
4

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3

Platinum Queen

Owned Passenger Lines

#

Type

Route

Payoff

Owner

Notes

A

Denver - Pueblo

$80

RMHL


8

A

Denver - Leadville

$260

RMHL

Discard after 3 more Leadville depletions

9
B
Denver - Leadville
$120
RMHL

10
B
Denver - Aspen
$130
RMHL

1

A

Denver - Boulder

$20

NTSB


3
A
Denver - Colorado Springs
$50
NTSB

4
A
El Paso - Deming
$60
GERR

14
B
El Paso - Albequerque
$220
GERR

2

A

Salt Lake City - Provo

$20

Platinum Queen


16
B
Salt Lake City - Grand Junction
$250
Platinum Queen
Discard when 22 is taken.  Good for $250 toward card 22
11
B
Salt Lake City - Grand Junction
$140
Platinum Queen
Discard when 20 is taken.  Good for $140 toward card 20 or 21

Available Claims

#

City

Type

Claim

Operation

Prospectors
113
Porter
Lumber
$60

$30; 2-5: D; 6-9: 1; 10: 3; 11-12: 4


48
Ouray
Silver
$60

$40; 2-7: D; 8: 1; 9-10: 2; 11-12: 4


118
Cimarron
Lumber
$60

$20; 2-6: D; 7: 1; 8-10: 2; 11-12: 3


59
Dolores
Lumber
$60

$40; 2-5: D; 6: 1; 7-10: 2; 11-12: 4


41
Leadville
Silver
$120

$50; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 4


89
Walsenburg
Coal
$60

$30; 2-5: D; 6: 2; 7-9: 3; 10-11: 4; 12: 5


31
Cripple Creek
Gold
$320

$80; 2-5: D; 6-8: 2; 9-10: 4; 11-12: 6


65
El Vado
Lumber
$100

$30; 2-4: D; 5-6: 1; 7-10: 2; 11-12: 3


Claims in italics are under first right of refusal.

Available Passenger Lines

#

Type

Route

Payoff

Cost

Notes

Prospectors

7

A

Pueblo - Santa Fe

$120

$280



23
C
Salt Lake City – Santa Fe
$900
$1340


20
C
Salt Lake City - Pueblo
$600
$930


21
C
Salt Lake City - Colorado Springs
$600
$930


19
C
Salt Lake City - Albuquerque
$600
$975


15

B

Denver - Grand Junction

$270

$435
Discard when 22 is taken.  Good for $270 toward card 22

22
C
Denver - Salt Lake City
$800
$1000


6

A

Santa Fe - Albequerque

$90

$180



Available Trains

Type

# Available

Cost

9

3

$80

15

1

$120

24
3
$200

Available Snowplows

Type

# Available

Cost

Die +2

2

$40

Die +3
1
$80
Map





Schnauzer Index Page