Goberian

Turn 9

Turn Order Determination

Turn orders is: NTSB, RMHL, EPRG. 

Prospector and Surveyor Placement

NTSB places prospectors on passenger line 7, passenger line 9, and #88 (+2) and surveyors on Vernal to Bridgeland, Elk Springs to Rangley, and Alimosa to South Fork (+1).

RMHL places prospectors on #51 (+1), #88 (+2), and passenger line 15, and surveys Grand Junction to Delta and Delta to Montrose (dr = 6, success).

EPRG places prospectors on #99 and #115 and surveys La Madeira to Vallecitos and Carizozo to Capitan.

Resolve Disputes

#88:  NTSB dr = 10 + 2 + 3 = 15.  RMHL dr = 11 + 2 + 3 = 16.  RMHL wins.

Operations and Construction

NTSB buys passenger line 7 for $280 and passenger line 9 for $230, builds Vernal to Bridgeland for $120 and Elk Springs to Rangley for $80, operates #56 ($30, 1 lumber), #131 ($20, 2 lumber), #35 ($50, 2 silver), #77 ($20, 1 coal), #74 ($20, 2 coal), #34 ($40, 1 silver), #121 ($30, 3 coal), and #132 ($50, 4 coal), gains $260 in pasenger revenue, delivers 6 lumber from Hot Sulphur Springs to Santa Fe for $960 and delivers 2 coal from Elk Springs to Craig.

RMHL buys claims #51 for $60, #88 for $80, and passenger line 15 for $435, builds Grand Junciton to Delta for $100, Delta to Montrose for $40, operates #85 ($30, 3 coal), #38 ($40, depletes), and #88 ($50, 4 coal), gains $660 in passenger revenue, delivers 1 silver from Aspen to Pueblo for $240, 6 coal fromCaņon City to Pueblo for $480, and 2 coal from Walsenburg to Pueblo for $160.

EPRG buys #99 for $50 and #115 for $100, builds La Madeira to Vallecitos for $80 and Carizozo to Capitan for $140, and operates #117 ($50, 2 lumber), #107 ($50, 2 copper) #125 ($20, 1 coal), #65 ($30, 1 lumber), #99 ($50, 4 gold), and #115 ($40, 3 lumber), gains $370 in passenger revenue, and delivers 8 coal from Capitan to El Paso for $960.

Deliveries

1 silver.

6 lumber to Santa Fe.

8 coal to Pueblo

8 coal to El Paso

Price Changes

Gold: Remains at $325

Copper: +2 to $400

Silver: +2 to $400


Denver
Salt Lake City
Pueblo
Santa Fe
El Paso
Lumber
+2 to $100
Remains at $200
+1 to $80
-2 to $100
Remains at $200
Coal
+1 to $60
Remains at $100
-3 to $40
Remains at $60
-2 to $100

Replenish Cards

Done.

Trains and Snowplows

HTSB sells a 15 train for $60 and buys a 42 train for $320.  RMHL sells a 9 train for $40 and buys a 42 train for $320.  EPRG sells a 9 train for $40 and buys a 42 train for $320.

Turn 10

Turn Order Determination

Turn orders is: EPRG, RMHL, NTSB.

The Players

Player

Company Name

Color

Turn Order

Starting Location

Money

Trains

Snowplows

Personnel

Andy York

North Texas Survey Board (NTSB)
Blue
3

Denver

$1,015

15, 15, 24, 42


S, S, S+1, P, P, P+2

Dave Hooton Rocky Mountain High Line (RMHL)
Orange
2

Denver

$1,275

9, 15, 15, 42

 +3

S, S, P, P+1, P+2

Bill Scharf

El Paso & Rio Grande (EPRG)
Red
1

El Paso

$4,740

15, 24, 24, 42


S, S, P, P+1

Personnel in italics are in jail.

Purchased Claims

#

City

Type

Available

Operation

Owner
56
Hot Sulphur Springs
Lumber
0

$30; 2-5: D; 6-8: 1; 9-10: 2; 11-12: 3

NTSB
131
Hot Sulphur Springs
Lumber
3

$20; 2-6: D; 7-8: 1; 9-11: 2; 12: 4

NTSB
35
Heber City
Silver
2

$50; 2-5: D; 6-7: 1; 8-10: 2; 11-12: 3

NTSB
77
Craig
Coal
11

$20; 2-4: D; 5: 1; 6: 2; 7-10: 3; 11-12: 4

NTSB
74
Elk Springs
Coal
0

$20; 2-4: D; 5-6: 2; 7-9: 3; 10: 4; 11-12: 5

NTSB
34
Heber City
Silver
1

$40; 2-7: D; 8: 1; 9-10: 2; 11-12: 4

NTSB
121
York Canyon
Coal
8

$30; 2: D; 3-6: 2; 7-8: 3; 9-10: 4; 11-12: 5

NTSB
132
Steamboat Springs
Coal
8

$50; 2-3: D; 4: 1; 5: 2; 6-7: 3; 8-12: 4

NTSB
147
Ouray
Silver
4

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3

RMHL
50
Silverton
Silver
8

$50; 2-6: D; 7-8: 2; 9-10: 3; 11-12: 4

RMHL
81
Crested Butte
Coal
12

$40; 2-5: D; 6: 1; 7: 3; 8-9: 4; 10-12: 5

RMHL
79
Bowie
Coal
7

$40; 2: D; 3: 1; 4: 2; 5-9: 3; 10-12: 4

RMHL
92
Raton
Coal
8

$40; 2-3: D; 4: 1; 5-8: 3; 9-10: 4; 11-12: 5

RMHL
64
Lumberton
Lumber
3

$40; 2-6: D; 7: 1; 8-11: 3; 12: 4

RMHL
85
Caņon City
Coal
0

$30; 2-3: D; 4: 1; 5-9: 3; 10-11: 4; 12: 5

RMHL
66
Vallecitos
Lumber
2

$30; 2-5: D; 6: 1; 7-10: 2; 11-12: 4

RMHL
88
Walsenburg
Coal
2

$50; 2-3: D; 4: 1; 5-8: 3; 9-10: 4; 11-12: 5

RMHL
51
Silverton
Silver
N

$30; 2-7: D; 8-9: 1; 10: 2; 11-12: 4

RMHL
100 White Oaks Gold 2
Depleted EPRG
117
Cloudcroft
Lumber
15

$50; 2-4: D; 5-6: 1; 7-9: 2; 10-12: 4

EPRG
109
Piņos Altos
Copper
5

Depleted

EPRG
107
Santa Rita
Copper
5

$50; 2-4: D; 5-7: 1; 8-9: 2; 10-12: 3

EPRG
125
Capitan
Coal
7

$20; 2-3: D; 4: 1; 5-9: 3; 10: 4; 11-12: 5

EPRG
62
Taos
Lumber
3

Depleted

EPRG
65
El Vado
Lumber
3

$30; 2-4: D; 5-6: 1; 7-10: 2; 11-12: 3

EPRG
99
White Oaks
Gold
4

$50; 2-7: D; 8-9: 2; 10: 3; 11-12: 4

EPRG
115
Paxton Springs
Lumber
3

$40; 2-3: D; 4-7: 1; 8-9: 2; 10-12: 3

EPRG 

Owned Passenger Lines

#

Type

Route

Payoff

Notes

Owner

1

A

Denver - Boulder

$20


NTSB

7

A

Pueblo - Santa Fe

$120


NTSB
9
B
Denver - Leadville
$120

NTSB

A

Denver - Pueblo

$80


RMHL
3
A
Denver - Colorado Springs
$50

RMHL

8

A

Denver - Leadville

$260

Discard after 2 more Leadville depletions

RMHL

15
B
Denver - Grand Junction
$270

Discard when 2 is taken. Good for $270 toward card 22

RMHL
4
A
El Paso - Deming
$60

EPRG
14
B
El Paso - Albequerque
$220

EPRG

6

A

Santa Fe - Albequerque

$90


EPRG

Available Claims

#

City

Type

Claim

Operation

Prospectors
68
Schofield
Coal
$80

$20; 2-3: D; 4-6: 2; 7-8: 3; 9-10: 4; 11-12: 5


114
McGaffey
Lumber
$40

$30; 2-5: D; 6-7: 1; 8-11: 2; 12: 4


59
Dolores
Lumber
$60

$40; 2-5: D; 6: 1; 7-10: 2; 11-12: 4


118
Cimarron
Lumber
$60

$20; 2-6: D; 7: 1; 8-10: 2; 11-12: 3


25
Bingham
Gold
$200

$60; 2-6; D; 7: 1; 8-9: 2; 10-12: 4


52
Lake City
Silver
$100

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3


91
Trinidad
Coal
$60

$30; 2-4: D; 5: 1; 6-8: 3; 9-10: 4; 11-12: 5


36
Eureka
Silver
$100

$50; 2-4: D; 5-7: 1; 8-10: 2; 11-12: 3


Claims in italics are under first right of refusal.

Available Passenger Lines

#

Type

Route

Payoff

Cost

Notes

Prospectors
10
B
Denver - Aspen
$130

$250



11
B
Salt Lake City - Grand Junction
$140
$310


Discard when 20 is taken. Good for $140 toward card 20 or 21


18
C
Gallup - Santa Rosa
$500
$660


20
C
Salt Lake City - Pueblo
$600
$930


12
B
Pueblo - Grand Junction
$150
$310

Discard when 20 is taken. Good for $150 toward card 20 or 21


24
C
Denver - El Paso
$1000
$1380


16
B
Salt Lake City - Grand Junction
$250
$465

Discard when 22 is taken. Good for $250 toward card 22


2

A

Salt Lake City - Provo

$20

$50



Available Trains

Type

# Available

Cost

9

5

$80

15

1

$120

24
5
$200
42
5
$320

Available Snowplows

Type

# Available

Cost

Die +2

3

$40

Die +3
3
$80
Die +4
5
$140
Map





Goberian Index Page