Goberian

Turn 1

Turn Order Determination

Turn orders is: NTSB, RMHL, EPRG.

Prospector and Surveyor Placement

NTSB places prospectors on #57 and #41 and surveyors on Denver to Boulder and Denver to Rollinsville (+1).

RMHL places prospectors #89 and #41 (+1) and surveyors on Dever to Colorado Springs and Colorado Springs to Pueblo (dr = 7, success).

EPRG places a prospector on #105 and surveyors on El Paso to Deming and El Paso to Rincon.

Resolve Disputes

#41:  NTSB dr = 5.  RMHL dr = 7+1.  RMHL wins, prospector becomes +2.

Operations and Construction

NTSB buys claim  #57 for  $40, builds Denver to Boulder for $80 and Denver to Rollinsville for $120, and operates #57 ($20, 2 lumber).

RMHL buys claim #89 for $60, claim #41 for $120, builds Denver to Colorado Springs for $160 and Colorado Springs to Pueblo for $100, and operates #89 ($30, 4 coal) and #41 ($50, 4 silver).

EPRG buys claim #105 for $40, builds El Paso to Deming for $240 and El Paso to Rincon for $160, and operates #105 ($40, 3 silver).

Deliveries

NTSB delivers 2 lumber from Boulder to Denver for $200.

Price Changes

Gold: +2 to $275

Copper: -1 to $160

Silver: -3 to $160


Denver
Salt Lake City
Pueblo
Santa Fe
El Paso
Lumber
-3 to $40
-1 to $100
+1 to $120
-2 to $40
Remains at $100
Coal
+1 to $60
-1 to $40
Remains at $40
-1 to $40
Remains at $60

Replenish Cards

The fourth card drawn is #94:  Deck is reshuffled.

Trains and Snowplows

NTSB buys a 15 train for $120. 

Turn 2

Turn Order Determination

Turn orders is: NTSB, RMHL, EPRG.

The Players

Player

Company Name

Color

Turn Order

Starting Location

Money

Trains

Snowplows

Personnel

Andy York

North Texas Survey Board (NTSB)
Blue
1

Denver

$2,420

9, 9, 15


S, S+1, P, P

Dave Hooton Rocky Mountain High Line (RMHL)
Orange
2

Denver

$2,080

9, 9

 

S, S, P, P+2

Bill Scharf

El Paso & Rio Grande (EPRG)
Red
3

El Paso

$2,120

9. 9


S, S, P, P+1

Personnel in italics are in jail.

Purchased Claims

#

City

Type

Available

Operation

Owner
57
Boulder
Lumber
0
$20; 2-6: D; 7-8: 1; 9-11: 2; 12: 3 NTSB
89
Wallsenburg
Coal
4

$30; 2-5: D; 6: 2; 7-9: 3; 10-11: 4; 12: 5

RMHL
41
Leadville
Silver
4
$50; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 4 RMHL
105 Silver City Silver 3
$40; 2-8: D; 9: 2; 10: 3; 11-12: 4 EPRG

Owned Passenger Lines

None

Available Claims

#

City

Type

Claim

Operation

Prospectors
128
South Fork
Silver
$100

$40; 2-7: D; 8: 1; 9: 2; 10-12: 4


100
White Oaks
Gold
$120

$40; 2-6: D; 7-10: 1; 11: 2; 12: 4


131
Hot Sulphur Springs
Lumber
$40

$20; 2-6: D; 7-8: 1; 9-11: 2; 12: 4


117
Cloudcroft
Lumber
$120

$50; 2-4: D; 5-6: 1; 7-9: 2; 10-12: 4


67
Coalville
Coal
$60

$30; 2-3: D; 4-6: 2; 7-10: 3; 11: 4; 12: 5


45
Westcliffe
Silver
$120

$30; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3


56
Hot Sulphur Springs
Lumber
$60

$30; 2-5: D; 6-8: 1; 9-10: 2; 11-12: 3


83
Durango
Coal
$80

$20; 2: D; 3-4: 2; 5-9: 3; 10-11: 4; 12: 5


Claims in italics are under first right of refusal.

Available Passenger Lines

#

Type

Route

Payoff

Cost

Notes

Prospectors

7

A

Pueblo - Santa Fe

$120

$280



6

A

Santa Fe - Albequerque

$90

$180



8

A

Denver - Leadville

$260

$500

Discard after 4 Leadville depletions


A

Denver - Pueblo

$80

$165



4
A
El Paso - Deming
$60
$135


3
A
Denver - Colorado Springs
$50
$105


1

A

Denver - Boulder

$20

$45



2

A

Salt Lake City - Provo

$20

$50



Available Trains

Type

# Available

Cost

9

0

$80

15

7

$120

Available Snowplows

Type

# Available

Cost

Die +2

3

$40

Map





Goberian Index Page