Perro de Presa Canario

Turn 24 (Winter)

Turn Order Determination

Turn orders is: RMHL, NTSB, D&SF.

Prospector and Surveyor Placement

RMHL prospects claim #65, claim #105, and claim #41 (+2) and does not survey.

NTSB prospects claim #41 and claim #105 (+2) and surveys Pagosa Springs to Durango, Durango to Farmington, Farmington to Newcomb, and Newcomb to Gallup (+1).

D&SF does not prospect or survey.

Dispute Resolution

#105:  RMHL dr = 10.  NTSB dr = 9 + 2 + 3 = 14.  NTSB wins.

#41:  RMHL dr = 5 + 2 + 3 = 10.  NTSB dr = 10 + 3 = 13.  NTSB wins, prospector becomes +1.

Operations and Construction

RMHL buys claim #65 for $100, operates #55 ($50, 2 lumber), #71 ($20, 3 coal), #77 ($20, 1 coal), #72 ($30, depletes), #67 ($30, 3 coal), #36 ($50, 2 silver), #78 ($40, 2 coal), #79 ($50, 2 coal), #35 ($50, 1 silver), #132 ($50, 4 coal), #68 ($20, 4 coal), #69 ($30, 3 coal), places the +5 snowplow on Rollinsville to Hot Sulphur Springs (dr = 2 + 5; succeeds), the +4 snowplow on Minturn to Leadville (dr = 2 + 4; succeeds), the +3 snowplow on Steamboat Springs to Walden (dr = 1 + 3; fails), uses a 42 train to deliver 5 silver from Eureka to Salt Lake City for $800, a 72 train to deliver 10 coal from Steamboat Springs to Denver for $1000, a 72 train to deliver 6 coal from Emery to Denver for $600, a 72 train to deliver 9 coal from Coalville to Salt Lake City for $900, and gains $2160 in passenger revenues.

NTSB buys claim #105 for $40, claim #41 for $120, dismantles Pagosa Springs to Durango for $60, Durango to Farmington for $50, Farmington to Newcomb for $50, and Gallup to Newcomb for $60, operates #97 ($40, 1 gold), #90 ($40, 3 coal), #116 ($30, depletes), #114 ($30, 2 lumber), #45 ($30, depletes), #98 ($60, 1 gold), #118 ($20, depletes), #105 ($40, depletes), #41 ($50, 1 silver), places a +5 snowplow on Trinidad to Raton (dr = 6 + 5; succeeds), a +5 snowplow on Thoreau to Gallop (dr = 6 + 5; succeeds), the +4 snowplow on Carrizozo to White Oaks (dr = 3 + 4; succeeds), uses a 42 train to deliver 2 silver from Leadville to Pueblo for $320, 72 train to deliver 3 coal from Alamo to Santa Fe for $360, a 72 train to deliver 3 coal from Trinidad to Santa Fe for $360, a 72 train to deliver 2 gold from White Oaks to El Paso for $400, and gains $2590 in passenger revenues.

D&SF operates #106 ($30, 1 copper), places a +5 snowplow on Placerville to Rico (dr = 2 + 5; succeeds), uses a 72 train to deliver 10 coal from Walsenberg to Denver for $1000, a 42 train to deliver 6 lumber from Dolores to Santa Fe for $960, a 42 train to deliver 3 copper from Cuba to Santa Fe for $720, a 72 train to deliver 8 coal from Crested Butte to Santa Fe for $960, gains $90 in passenger revenues.

The Players

Player

Company Name

Color

Turn Order

Starting Location 1

Starting Location 2

Money

Trains

Snowplows

Surveyors

Prospectors
Dave Hooton Rocky Mountain High Line (RMHL)
Orange
1

Denver

Salt Lake City

$59,255

42, 72, 72, 72

+3, +4, +5

S, S, S +1
P, P, P+2

Andy York

North Texas Survey Board (NTSB)
Blue
2

Denver

El Paso

$49,025

42, 72, 72, 72

+4, +5, +5

S, S, S, S+1
P+1, P+2

Bill Scharf

Denver & Santa Fe (D&SF)
Red
3

Denver

Santa Fe

$50,490

42, 42, 72, 72

+5, +5

S+1, S+2
P, P+2, P+2

Personnel in italics are in jail.

End of Game Statements

Dave Hooton (Rocky Mountain High Line):  I started a with a difficult claims situation - it wasn't until Turn 4 when I had a couple of claims that didn't deplete immediately or eventually blocked by others with my first delivery being on Turn 5. For a long time, there were no claims near my Salt Lake City except for the Price coal main. For these reason, I went straight for the passenger lines from Denver to Leadville and Grand Junction to get a basic income.

Thanks, Chris, for running the game.

Andy York (North Texas Survey Board):  As usual, I was concentrating on playing the game without keeping in mind when it was to end. So, a number of actions in the last turns weren’t the best I should’ve done. But, I don’t think it mattered in the final results. I was hoping my passenger routes would have given me more of an advantage, but no such luck.

Good game all! Congrats to Dave on the win and appreciation to Chris for running the game and helping through my errors in writing orders.

Purchased Claims

#

City

Type

Available

Operation

Owner
48
Ouray
Silver
1

$40; 2-7: D; 8: 1; 9-10: 2; 11-12: 4

RMHL
50
Silverton
Silver
N

$50; 2-6: D; 7-8: 2; 9-10: 3; 11-12: 4

RMHL
70
Price
Coal
3

Depleted

RMHL
55
Walden
Lumber
4

$50; 2-3: D; 4-5: 1; 6-9: 2; 10-12: 3

RMHL
77
Craig
Coal
9

$20; 2-4: D; 5: 1; 6: 2; 7-10: 3; 11-12: 4

RMHL
71
Sunnyside
Coal
4

$20; 2: D; 3-4: 2; 5-9: 3; 10-11: 4; 12: 5

RMHL
76
Craig
Coal
4

Depleted

RMHL
78
Bowie
Coal
6

$40; 2-4: D; 5-6: 2; 7-8: 3; 9-10: 4; 11-12: 5

RMHL
36
Eureka
Silver
5

$50; 2-4: D; 5-7: 1; 8-10: 2; 11-12: 3

RMHL
67
Coalville
Coal
0

$30; 2-3: D; 4-6: 2; 7-10: 3; 11: 4; 12: 5

RMHL
79
Bowie
Coal
8

$40; 2: D; 3: 1; 4: 2; 5-9: 3; 10-12: 4

RMHL
112
Tyrone
Copper
N

$20; 2-6: D; 7-9: 1; 10-11: 2; 12: 3

RMHL
35
 Heber City
Silver
1

$50; 2-5: D; 6-7: 1; 8-10: 2; 11-12: 3

RMHL
132
Steamboat Springs
Coal
1

$50; 2-3: D; 4: 1; 5: 2; 6-7: 3; 8-12: 4

RMHL
128
South Fork
Silver
N

$40; 2-7: D; 8: 1; 9: 2; 10-12: 4

RMHL
68
Schofield
Coal
9

$20; 2-3: D; 4-6: 2; 7-8: 3; 9-10: 4; 11-12: 5

RMHL
69
Scofield
Coal
6

$30; 2-5: D; 6: 1; 7: 2; 8-9: 3; 10-12: 4

RMHL
65
El Vado
Lumber
N

$30; 2-4: D; 5-6: 1; 7-10: 2; 11-12: 3

RMHL
97
Elizabethtown
Gold
3

$40; 2-6; D; 7: 1; 8-9: 2; 10-12: 3

NTSB
130
Bingham
Copper
N

$80; 2: D; 3-9: 1; 10-11: 2; 12: 3

NTSB
90
Trinidad
Coal
0

$40; 2: D; 3: 1; 4: 2; 5-9: 3; 10-12: 4

NTSB
116
Piņos Altos
Lumber
1

Depleted

NTSB
114
McGaffey
Lumber
2

$30; 2-5: D; 6-7: 1; 8-11: 2; 12: 4

NTSB
98
Piņos AltosGold
2

$60; 2-6: D; 7: 1; 8-10: 2; 11-12: 4

NTSB
41
Leadville
Silver
0

$50; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 4

NTSB
63
Lumberton
Lumber
2

Depleted

D&SF
58
Dolores
Lumber
2

$40; 2-3: D; 4-5: 1; 6-9: 2; 10-12: 3

D&SF
88
Walsenburg
Coal
16

$50; 2-3: D; 4: 1; 5-8: 3; 9-10: 4; 11-12: 5

D&SF
108
Lordsburg
Copper
N

$40; 2-4: D; 5-6: 1; 7-10: 2; 11-12: 3

D&SF
122
Lee Ranch West
Coal
1

Depleted

D&SF
119
Farmington
Coal
5

Depleted

D&SF
59
Dolores
Lumber
0

$40; 2-5: D; 6: 1; 7-10: 2; 11-12: 4

D&SF
47
Ouray
Silver
0

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3

D&SF
62
Taos
Lumber
1

Depleted

D&SF
106
Cuba
Copper
0

$30; 2-5: D; 6-8: 1; 9-10: 2; 11-12: 3

D&SF
44
Leadville
Silver
2

Depleted

D&SF
42
Leadville
Silver
1

Depleted

D&SF
52
Lake City
Silver
0

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3

D&SF
31
Cripple Creek
Gold
2

Depleted

D&SF
125
Capitan
Coal
N

$20; 2-3: D; 4: 1; 5-9: 3; 10: 4; 11-12: 5

D&SF
91
Trinidad
Coal
15

$30; 2-4: D; 5: 1; 6-8: 3; 9-10: 4; 11-12: 5

D&SF
82
Crested Butte
Coal
4

$20; 2-4: D; 5-6: 2; 7-9: 3; 10-11: 4; 12: 5

D&SF
49
Silverton
Silver
0

$40; 2-5: D; 6-7: 1; 8-9: 2; 10-12: 3

D&SF
64
Lumberton
Lumber
1

Depleted

D&SF
46
Telluride
Silver
3

$40; 2-4: D; 5-8: 1; 9-10: 2; 11-12: 4

D&SF

Owned Passenger Lines

#

Type

Route

Payoff

Notes

Owner

1

A

Denver - Boulder

$20


RMHL
2
A
Salt Lake City - Provo
$20

RMHL
9
B
Denver - Leadville
$120

RMHL
10
B
Denver - Aspen
$130

RMHL
22
C
Denver - Salt Lake City
$800

RMHL
20
C
Salt Lake City - Pueblo
$600

RMHL
21
C
Salt Lake City - Colorado Springs
$600

RMHL
3
A
Denver - Colorado Springs
$50

NTSB
4
A
El Paso - Deming
$60

NTSB

A

Denver - Pueblo

$80


NTSB
14
B
El Paso - Albuquerque
$220

NTSB
13
B
El Paso - Santa Fe
$140

NTSB
24
C
Denver - El Paso
$1000

NTSB

7

A

Pueblo - Santa Fe

$120


NTSB
18
C
Gallup - Santa Rosa
$500

NTSB
17
C
Denver - Santa Fe
$420

NTSB

6

A

Santa Fe - Albequerque

$90


D&SF

Available Claims

#

City

Type

Claim

Operation

Prospectors
73
Hiawatha
Coal
$60

$20; 2-5: D; 6: 1; 7: 2; 8-9: 3; 10-12: 4


Claims in italics are under first right of refusal.

Available Passenger Lines

#

Type

Route

Payoff

Cost

Notes

Prospectors
23
C
Salt Lake City - Santa Fe
$900

$1340



19
C
Salt Lake City - Albuquerque
$600
$975


Available Trains

Type

# Available

Cost

9

6

$80

15

8

$120

24
8
$200
42
4
$320
72
0
$500

Available Snowplows

Type

# Available

Cost

Die +2

3

$40

Die +3
3
$80
Die +4
3
$120
Die +5
1
$200
Map





Goberian Index Page