Perro de Presa Canario

Turn 20 (Winter)

Turn Order Determination

Turn orders is: D&SF, RMHL, NTSB.

Prospector and Surveyor Placement

D&SF prospects claim #82, claim #29 (+2), claim #81 (+2), and does not survey.

RMHL prospects claim #29 (+2), claim #79, claim #114, and surveys Price to Sunnyside and Salt Lake City to Coalville (+1).

NTSB prospects claim #116 and claim #114 (+2) and does not survey.

Dispute Resolution

#29:  D&SF dr = 7 + 3 + 2 = 12.  RMHL dr = 5 + 3 + 2 = 10.  D&SF wins.

#114: RMHL dr = 7.  NTSB dr = 9 + 2 = 11.  NTSB wins.

Operations and Construction

D&SF buys claim #82 for $60, #81 for $80, #29 for $100, operates #58 ($40, 1 lumber), #88 ($50, 4 coal), #33 ($50, depletes), #59 ($40, 1 lumber), #47 ($40, 1 silver), #106 ($30, 1 copper), #53 ($30, depletes), #52 ($40, 1 silver), #31 ($80, 2 gold), #91 ($30, 1 coal), #82 ($20, 3 coal), #81 ($40, 5 coal), #29 ($20, 4 gold), places a +5 snowplow on the Placerville to Rico segment (dr = 2 + 5 = 7; succeeds), uses a 72 train to deliver 9 silver from Ouray to Santa Fe for $3600, a 72 train to deliver 8 silver from Lake City to Santa Fe for $3200, a 42 train to deliver 6 lumber from Porter to Santa Fe for $960, a 24 train to deliver 4 silver from Lake City to Santa Fe for $2400, gains $90 in passenger revenues.

RMHL buys claim #79 for $80, builds Price to Sunnyside for $100, Salt Lake City to Coalville for $120, operates #70 ($40, 4 coal), #55 ($50, 3 lumber), #71 ($20, 3 coal), #76 ($20, 2 coal), #77 ($20, 4 coal), #72 ($30, 3 coal), #67 ($30, 1 coal), #36 ($50, 2 silver), #78 ($40, 3 coal), #79 ($50, 4 coal), places the +5 snowplow on Rollinsville to Hot Sulphur Springs (dr = 3 + 5; succeeds), the +4 snowplow on Minturn to Leadville (dr = 5 + 4; succeds), the +3 snowplow on Steamboat Springs to Walden (dr = 4 + 3; succeeds), uses a 42 train and to deliver 4 silver from Eureka to Salt Lake City for $1600, a 72 train to deliver 8 lumber from Walden to Salt Lake City for $2400, a 72 train to deliver 9 coal from Sunnyside to Denver for $900, a 72 train to deliver 8 coal from Craig to Salt Lake City, and gains $2290 in passenger revenues.

NTSB buys claim #116 for $60, claim #114 for $40, operates #87 ($30, 3 coal), #90 ($40, 2 coal), #60 ($20, 2 lumber), #107 ($50, depletes), #116 ($30, 1 lumber), #114 ($30, 2 lumber), places a +5 snowplow on Trinidad to Raton (dr = 6 + 5; succeeds), a +5 snowplow on the Silver City to Piņos Altos (dr = 5 + 5; succeeds), a +4 snowplow on Piņos Altos to Mogollon (dr = 3 + 4; succeeds), uses a 42 train to deliver 2 silver from Mogollon to El Paso for $800, 72 train to deliver 8 coal from Alamo to El Paso for $1120, a 72 train to deliver 5 coal from Alamo to Santa Fe for $600, a 72 train to deliver 1 lumber from Piņos Altos to Pueblo for $200, and gains $2090 in passenger revenues.

Deliveries

Gold: 0

Copper: 0

Silver: 27


Denver
Salt Lake City
Pueblo
Santa Fe
El Paso
Lumber

8
1
6

Coal
9
8

5
8

Price Changes

Gold: +1 to $250

Copper: +3 to $320

Silver: -7 to $160


Denver
Salt Lake City
Pueblo
Santa Fe
El Paso
Lumber
+3 to $160
-1 to $240
Remains at $200
Remains at $160
Remains at $200
Coal
+1 to $120
Remains at $100
Remains at $80
Remains at $120
Remains at $140

Purchase Trains and Snowplows

D&SF sells a 24 train for $100 and buys a 42 train for $320.

Turn 21

Turn Order Determination

Turn orders is: NTSB, RMHL, D&SF.

The Players

Player

Company Name

Color

Turn Order

Starting Location 1

Starting Location 2

Money

Trains

Snowplows

Surveyors

Prospectors
Dave Hooton Rocky Mountain High Line (RMHL)
Orange
2

Denver

Salt Lake City

$34,225

42, 72, 72, 72

+3, +4, +5

S, S, S +1
P, P, P+2

Andy York

North Texas Survey Board (NTSB)
Blue
3

Denver

El Paso

$28,275

42, 72, 72, 72

+4, +5, +5

S, S, S, S+1
P, P+2

Bill Scharf

Denver & Santa Fe (D&SF)
Red
1

Denver

Santa Fe

$30,270

42, 42, 72, 72

+5

S+1, S+2
P, P+2, P+2

Personnel in italics are in jail.


Purchased Claims

#

City

Type

Available

Operation

Owner
48
Ouray
Silver
1

$40; 2-7: D; 8: 1; 9-10: 2; 11-12: 4

RMHL
50
Silverton
Silver
N

$50; 2-6: D; 7-8: 2; 9-10: 3; 11-12: 4

RMHL
70
Price
Coal
7

$40; 2-4: D; 5-7: 2; 8-9: 3; 10: 4; 11-12: 5

RMHL
55
Walden
Lumber
3

$50; 2-3: D; 4-5: 1; 6-9: 2; 10-12: 3

RMHL
72
Emery
Coal
4

$30; 2-4: D; 5: 1; 6: 2; 7-10: 3; 11-12: 4

RMHL
25
Bingham
Gold
20

Depleted

RMHL
77
Craig
Coal
0

$20; 2-4: D; 5: 1; 6: 2; 7-10: 3; 11-12: 4

RMHL
71
Sunnyside
Coal
0

$20; 2: D; 3-4: 2; 5-9: 3; 10-11: 4; 12: 5

RMHL
76
Craig
Coal
5

$20; 2-3: D; 4-5: 2; 6-8: 3; 9-10: 4; 11-12: 5

RMHL
78
Bowie
Coal
3

$40; 2-4: D; 5-6: 2; 7-8: 3; 9-10: 4; 11-12: 5

RMHL
36
Eureka
Silver
0

$50; 2-4: D; 5-7: 1; 8-10: 2; 11-12: 3

RMHL
67
Coalville
Coal
5

$30; 2-3: D; 4-6: 2; 7-10: 3; 11: 4; 12: 5

RMHL
79
Bowie
Coal
4

$40; 2: D; 3: 1; 4: 2; 5-9: 3; 10-12: 4

RMHL
87
Alamo
Coal
0

$30; 2-4: D; 5-6: 2; 7-8: 3; 9-10: 4; 11-12: 5

NTSB
97
Elizabethtown
Gold
N

$40; 2-6; D; 7: 1; 8-9: 2; 10-12: 3

NTSB
130
Bingham
Copper
N

$80; 2: D; 3-9: 1; 10-11: 2; 12: 3

NTSB
90
Trinidad
Coal
4

$40; 2: D; 3: 1; 4: 2; 5-9: 3; 10-12: 4

NTSB
60
Pagosa Springs
Lumber
2

$20; 2-5: D; 6-7: 1; 8-11: 2; 12: 3

NTSB
99
White Oaks
Gold
2

Depleted

NTSB
126
Santa Rita
Coal
8

Depleted

NTSB
107
Santa Rita
Copper
3

Depleted

NTSB
116
Piņos Altos
Lumber
0

$30; 2-5: D; 6-7: 1; 8-10: 2; 11-12: 3

NTSB
114
McGaffey
Lumber
2

$30; 2-5: D; 6-7: 1; 8-11: 2; 12: 4

NTSB
63
Lumberton
Lumber
2

Depleted

D&SF
58
Dolores
Lumber
8

$40; 2-3: D; 4-5: 1; 6-9: 2; 10-12: 3

D&SF
88
Walsenburg
Coal
29

$50; 2-3: D; 4: 1; 5-8: 3; 9-10: 4; 11-12: 5

D&SF
108
Lordsburg
Copper
N

$40; 2-4: D; 5-6: 1; 7-10: 2; 11-12: 3

D&SF
122
Lee Ranch West
Coal
9

Depleted

D&SF
119
Farmington
Coal
5

Depleted

D&SF
59
Dolores
Lumber
5

$40; 2-5: D; 6: 1; 7-10: 2; 11-12: 4

D&SF
47
Ouray
Silver
0

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3

D&SF
62
Taos
Lumber
1

Depleted

D&SF
84
Durango
Coal
5

Depleted

D&SF
106
Cuba
Copper
2

$30; 2-5: D; 6-8: 1; 9-10: 2; 11-12: 3

D&SF
44
Leadville
Silver
2

Depleted

D&SF
42
Leadville
Silver
1

Depleted

D&SF
52
Lake City
Silver
0

$40; 2-6: D; 7-8: 1; 9-10: 2; 11-12: 3

D&SF
31
Cripple Creek
Gold
10

$80; 2-5: D; 6-8: 2; 9-10: 4; 11-12: 6

D&SF
125
Capitan
Coal
N

$20; 2-3: D; 4: 1; 5-9: 3; 10: 4; 11-12: 5

D&SF
91
Trinidad
Coal
5

$30; 2-4: D; 5: 1; 6-8: 3; 9-10: 4; 11-12: 5

D&SF
82
Crested Butte
Coal
3

$20; 2-4: D; 5-6: 2; 7-9: 3; 10-11: 4; 12: 5

D&SF
81
Crested Butte
Coal
5

$40; 2-5: D; 6: 1; 7: 3; 8-9: 4; 10-12: 5

D&SF
29
Leadville
Gold
4

$20; 2-7: D; 8: 1; 9-10: 2; 11-12: 4

D&SF

Owned Passenger Lines

#

Type

Route

Payoff

Notes

Owner

1

A

Denver - Boulder

$20


RMHL
2
A
Salt Lake City - Provo
$20

RMHL
9
B
Denver - Leadville
$120

RMHL
10
B
Denver - Aspen
$130

RMHL
22
C
Denver - Salt Lake City
$800

RMHL
20
C
Salt Lake City - Pueblo
$600

RMHL
21
C
Salt Lake City - Colorado Springs
$600

RMHL
3
A
Denver - Colorado Springs
$50

NTSB
4
A
El Paso - Deming
$60

NTSB

A

Denver - Pueblo

$80


NTSB
14
B
El Paso - Albuquerque
$220

NTSB
13
B
El Paso - Santa Fe
$140

NTSB
24
C
Denver - El Paso
$1000

NTSB

7

A

Pueblo - Santa Fe

$120


NTSB
18
C
Gallup - Santa Rosa
$500

NTSB
17
C
Denver - Santa Fe
$420

NTSB

6

A

Santa Fe - Albequerque

$90


D&SF

Available Claims

#

City

Type

Claim

Operation

Prospectors
73
Hiawatha
Coal
$60

$20; 2-5: D; 6: 1; 7: 2; 8-9: 3; 10-12: 4


75
Rangely
Coal
$80

$20; 2-4: D; 5-6: 2; 7-9: 3; 10: 4; 11-12: 5


49
Silverton
Silver
$140

$40; 2-5: D; 6-7: 1; 8-9: 2; 10-12: 3


68
Schofield
Coal
$80

$20; 2-3: D; 4-6: 2; 7-8: 3; 9-10: 4; 11-12: 5


64
Lumberton
Lumber
$60

$40; 2-6: D; 7: 1; 8-11: 3; 12: 4


34
Heber City
Silver
$80

$40; 2-7: D; 8: 1; 9-10: 2; 11-12: 4


112
Tyrone
Copper
$60

$20; 2-6: D; 7-9: 1; 10-11: 2; 12: 3


109
Piņos Altos Copper
$80

$20; 2-5: D; 6-7: 1; 8-11: 2; 12: 3


Claims in italics are under first right of refusal.

Available Passenger Lines

#

Type

Route

Payoff

Cost

Notes

Prospectors
23
C
Salt Lake City - Santa Fe
$900

$1340



19
C
Salt Lake City - Albuquerque
$600
$975


Available Trains

Type

# Available

Cost

9

6

$80

15

8

$120

24
8
$200
42
4
$320
72
0
$500

Available Snowplows

Type

# Available

Cost

Die +2

3

$40

Die +3
3
$80
Die +4
3
$120
Die +5
2
$200
Map





Goberian Index Page